Documentation · ReportPilot
Current development workflow

Generate your first ReportPilot report.

This guide documents the current high-level workflow visible in the ReportPilot development build. Installer details, exact compatibility and release-specific configuration remain pending verification.

ReportPilot ribbon inside Autodesk Navisworks development screenshot
ReportPilot ribbon · development preview
Development guidance

Before you start

ReportPilot runs from Autodesk Navisworks and generates from the model that is currently open. Public installer and upgrade instructions will be published when release delivery is approved.

01Open the Navisworks model you want to use with ReportPilot.
02Confirm the required Clash Detective tests exist in the model.
03Open the ReportPilot ribbon to begin the report workflow.
01
Current development workflow

Choose Generate Report

From the ReportPilot ribbon, choose Generate Report. The current development dialog builds from the open model and lets you choose the report type.

ReportPilot Generate Report dialog
Choose the report type to build from the current Navisworks model.
02
Clash report workflow

Select the live clash tests

For a clash report, select the required live Clash Detective tests. The current interface supports searching and filtering the available tests before continuing.

ReportPilot clash test selection dialog
Select the tests that should be included in the ReportPilot report.
03
Clash report workflow

Review snapshot appearance

Review the snapshot appearance options before generation. The current development view includes visibility, highlighting, camera/rendering, image size and snapshot format controls.

ReportPilot snapshot appearance dialog
Current development snapshot appearance controls.

Performance guidance: exact public timing guidance will be published only after repeatable validation against approved release builds and representative project conditions.

04
Current development workflow

Manage generated reports in My Reports

The current My Reports view provides access to generated reports for the current model and other model contexts, including actions exposed by the development build.

ReportPilot My Reports development dialog
My Reports · current development interface.
ReportPilot user guide

Set up your ReportPilot project

Start in ReportPilot → Report Setup → Project. Complete the Project pages in order so the model is connected to the correct ReportPilot project, the report contains the right project information, stakeholder logos appear in the intended order, and the selected header is ready before you generate a report.

1ConnectionConfirm which ReportPilot project the model belongs to.
2DetailsEnter the project information and add a project image if required.
3Logos & StakeholdersAdd the required logos and arrange their order.
4Header TemplatesChoose Classic, Executive or Panoramic and preview the result.
5Save Project SetupCommit the Project configuration.
6Generate reportCreate a fresh Clash or Viewpoint report and review the header.

First-time setup: Connection → Details → Logos & Stakeholders → Header Templates → Save Project Setup → generate a fresh report.

Project → Connection

Connect your ReportPilot project

Connection tells ReportPilot which ReportPilot project this Navisworks model belongs to and where its project information is stored.

A ReportPilot project is identified by its Project ID. The Navisworks filename or Windows folder location by itself does not determine which ReportPilot project the model belongs to. This matters when a Navisworks model is copied, renamed or intentionally branched.

ReportPilot Report Setup Project Connection page with Local Project, Team Shared Project, Join Project, Project ID, Join Code and Create as New ReportPilot Project controls
Report Setup → Project → Connection. Sensitive project identifiers are hidden in this public example.

Local Project

Choose Local Project when you are working with the ReportPilot project on this computer.

The displayed folder is simply the local storage location ReportPilot is using for the project.

Team / Shared Project

Choose Team / Shared Project when the ReportPilot project is stored in a shared location available to your computer.

  1. Select Team / Shared Project.
  2. Choose Locate....
  3. Select the correct existing ReportPilot shared location.
  4. Confirm the project shown by ReportPilot.
  5. Save Project Setup when the connection is correct.

Important: Select the existing ReportPilot project location carefully. Do not create a new shared project simply because an existing project cannot immediately be found.

Join an existing project

An existing ReportPilot project can be joined with either its Project ID or Join Code.

  1. Ask the project coordinator for the Project ID or Join Code.
  2. Paste it into Join Project.
  3. Select Connect.
  4. ReportPilot searches for the corresponding project information available to the current computer.
  5. If the project is found, review it before accepting the connection.
  6. If ReportPilot cannot find it automatically, follow the prompt to locate the project folder once.
  7. After the correct project is loaded, select Save Project Setup.

Good to know: Connecting to an existing project loads that project's ReportPilot setup. It does not merge two different ReportPilot projects together.

Project IDThe unique ReportPilot project identity. Use Copy when an authorized team member needs the full ID.
Join CodeA shorter user-friendly code that can be copied and shared with an authorized user joining the same ReportPilot project.
Project CodeThe business/project reference displayed in the report. It is not the ReportPilot Project ID.

Create as New ReportPilot Project

Use Create as New ReportPilot Project when this Navisworks model should become an independent ReportPilot project rather than remain connected to the existing one—for example a separate test branch or a genuinely separate coordination project.

Creating a new ReportPilot project gives the model a new ReportPilot project identity. It does not delete or modify the previously connected ReportPilot project.

Important: Do not choose Create as New ReportPilot Project when your intention is simply to reconnect to an existing project. Use Join Project instead.

Copied or renamed Navisworks models

Copying or renaming a Navisworks file does not automatically mean it should become a different ReportPilot project. If the copy should continue with an existing ReportPilot project, connect using its Project ID or Join Code. If the copy is intentionally independent, use Create as New ReportPilot Project.

Project → Details

Enter your project details

Project Details controls the project information ReportPilot can use in the report header. Complete this information before generating your first report so Clash and Viewpoint reports use consistent project information.

ReportPilot Project Details page showing report names, optional project image controls, project fields, Show in report, Panoramic role and Panoramic icon controls
Report Setup → Project → Details. Example project-specific values and unverified technical limits are hidden in this public image.

Field

The name or label of the project information, such as Project Name, Project Code or Location.

Value

The project information associated with that field. Enter information that is intended for the report.

Show in report

Controls whether that project detail is displayed in the generated report. Turning it off is a presentation choice, not a security redaction.

Project ID and Project Code are different. Project ID identifies the ReportPilot project. Project Code is the business/project reference you want displayed in the report.

Add a project image

A Project Image is optional. It can be used by the selected Header Template to give the report a project-specific visual identity.

  1. Open Project → Details.
  2. Choose or replace the Project Image.
  3. Review the image preview.
  4. Use Remove image when no project image is required.
  5. Choose whether the project image should appear in the reports.
  6. Select Save Project Setup.
  7. Preview the Header Template or generate a fresh report to review the result.

Tip: Use a clear image with a simple composition. Different Header Templates present the project image differently, so check the preview before issuing the report.

Recommended Details workflow

  1. Review the available project fields.
  2. Enter the correct values for Project Name, Project Code, Location and any other required information.
  3. Use Show in report to control what should appear.
  4. Avoid creating duplicate Location fields simply to force Location into more than one header position.
  5. Continue to Logos & Stakeholders, then save the overall Project Setup when the configuration is complete.
Verified user guidance · Project → Logos & Stakeholders

Add and arrange Logos & Stakeholders

Logos & Stakeholders lets you manage the organizations represented in the report header and control the order in which their logos appear.

ReportPilot Logos and Stakeholders page showing stakeholder logo sequence, optional captions, Show this stakeholder in report, Add image, Remove, Move up and Move down controls
Report Setup → Project → Logos & Stakeholders.

Add and review stakeholders

  1. Add or review the required organization logos.
  2. Review the stakeholder information associated with each logo.
  3. Confirm that the correct organization information stays with the correct logo.
  4. Use the available Show control when stakeholder information should or should not appear in the report.

ReportPilot does not require you to recreate a stakeholder just to change its position.

Arrange stakeholder logos

Move up / Move down

  1. Select a logo.
  2. Choose Move up to place it earlier.
  3. Choose Move down to place it later.
  4. Continue until the required order is reached.

Drag and drop

  1. Select the logo.
  2. Drag it to the required position.
  3. Drop it into the new position.
  4. Review the complete sequence before saving.

The saved order in Logos & Stakeholders is the intended left-to-right stakeholder order in the generated report header. This applies to Classic, Executive and Panoramic.

When a logo is reordered, its associated stakeholder information remains with that logo. Save Project Setup keeps the new order. Cancel Project Edits discards an unsaved reorder.

Verified user guidance · Project → Header Templates

Choose your report header template

Header Templates control how the project information, project image and stakeholder logos are presented at the top of ReportPilot reports. Choose one layout for both Clash and Viewpoint reports.

ReportPilot Header Templates page showing Classic, Executive and Panoramic template choices, header density, project image fit, stakeholder strip, optional subtitle and preview controls
Report Setup → Project → Header Templates. Preview the staged header before saving and generating a fresh report.
Classic ReportPilot header template showing stakeholder logos, project image and project details
Classic header template
01

Classic

Classic provides a straightforward ReportPilot header with clear project identity and stakeholder information.

Executive ReportPilot header template showing stakeholder logos above the report title with project image and project details
Executive header template
02

Executive

Executive provides a more presentation-focused header while using the same saved project and stakeholder information.

Panoramic ReportPilot header template with full-width project image, project identity and structured stakeholder and project detail sections
Panoramic header template
03

Panoramic

Panoramic provides a wider visual header designed to present project identity, project imagery and stakeholder logos across the available header space.

Recommended Panoramic image: use a wide landscape image close to 16:9. Approximately 1920 × 1080 px gives the best visual quality, with 1280 × 720 px as a practical minimum. Keep important content away from the extreme edges because slight cropping may occur. These are presentation recommendations, not hard upload requirements.

The stakeholder order saved in Logos & Stakeholders remains the left-to-right order in Panoramic. Panoramic may center the group visually, but it does not change the saved sequence.

Project Code is not Project ID. Project Name identifies the project, Project Code is the business/project reference entered by the user, Location is presented once in the accepted layout, and stakeholder logos follow the saved Logos & Stakeholders order.

Preview the header

Preview lets you check the staged header appearance before issuing a report. Preview does not replace Save Project Setup.

  1. Select Classic, Executive or Panoramic.
  2. Preview the Clash or Viewpoint header.
  3. Return to Details if project information needs correction.
  4. Return to Logos & Stakeholders if logo information or order needs correction.
  5. Select Save Project Setup.
  6. Generate a fresh Clash or Viewpoint report and check the generated header before issue.
Complete the Project workflow

Save your Project Setup

Connection, Details, Logos & Stakeholders and Header Templates work together as one Project Setup workflow. Save Project Setup commits the Project configuration. Cancel Project Edits discards unsaved project changes.

01Connection — confirm which ReportPilot project the model belongs to.
02Details — enter project information and add a Project Image if required.
03Logos & Stakeholders — add stakeholders and arrange their order.
04Header Templates — choose Classic, Executive or Panoramic and preview it.
05Select Save Project Setup.
06Generate a fresh Clash or Viewpoint report and review the final header.

Important: ordinary Navisworks Ctrl+S does not replace ReportPilot's Save Project Setup action while you are editing Report Setup.

After you change Project Setup

Generated reports are outputs. When you change report presentation settings, save Project Setup and generate a new report when the deliverable needs to reflect those changes.

  1. Save Project Setup.
  2. Generate a fresh Clash or Viewpoint report.
  3. Review the new header.
  4. Issue or publish the newly generated report as required.

Previously generated HTML reports are not automatically rewritten when the saved header configuration changes. Generate a fresh report for the updated presentation.

Verified user guidance

Project identity and safe model copies

ReportPilot identifies a coordination project by its stable Project ID, not by the Navisworks model filename. Two model files can have the same name and still belong to different ReportPilot projects.

If ReportPilot detects an unknown copied NWF/NWD, decide what the copy represents before project data is written:

Create as New ReportPilot ProjectUse this when the copied model must be isolated from the original project. A new Project ID is created.
Connect to Existing ProjectUse this only when the copy is intentionally part of an existing ReportPilot project.
CancelUse this when you are not sure which project the model should belong to.
ReportPilot copied model detected dialog
Copied-model safety gate: create a new project, connect deliberately, or cancel.

Safety rule: confirm identity from Report Setup → Connection using the Project ID / Join Code. Do not decide project identity from the model filename alone.

User-tested development guidance

Choose what a new project carries forward

When you create a new ReportPilot project from a copied model, all three choices create a new Project ID. The source project remains unchanged and the new project does not synchronize changes back to it.

Start Clean — RecommendedStart from ReportPilot defaults without the source project's coordination history or snapshots.
Copy Project SetupReuse project/setup configuration such as metadata, logos and report settings, but start without coordination history or snapshots.
Clone Complete ReportPilot ProjectCarry setup plus coordination/history. Existing snapshots/images are copied only when that optional choice is explicitly enabled.
ReportPilot new project seed options
All three choices create a new Project ID; choose what the independent project should carry forward.

Machine-local connection mappings are not cloned. After creation, confirm the newly displayed Project ID before continuing.

Verified user guidance

Discussion, Evidence and saving review data

Navisworks Comments and ReportPilot Discussion are different. Navisworks Comments remain a separate read-only source in ReportPilot; use ReportPilot Discussion for ReportPilot coordination replies and actions.

Main coordinator Clash and Viewpoint reports save accepted review state to the report/project files. When the browser asks for access, connect Project Data / Project Folder to the existing project location.

ReportPilot Coordination panel showing Discussion and Evidence
ReportPilot Discussion and Evidence & Attachments in the coordination panel.
ReportPilot project folder reconnect state
Reconnect when browser folder access is not active.
Browser permission prompt for ReportPilot project files
Allow access to the existing project folder.
ReportPilot showing Saved to project files and Project files connected
Wait for “Saved to project files”.

Before closing or reloading: wait until the report shows Saved to project files. Changes that are still pending in the open tab are not durable and can be lost if the page is closed or reloaded before a successful save.

Current file protection does not provide distributed conflict merging. For shared-drive workflows, finish and synchronize edits from one PC before editing the same report from another PC.

Needs verification

Supported Navisworks versions

The public compatibility matrix is not yet approved. Exact supported Autodesk Navisworks versions will be published only after validation against the release build.

Next

Explore the current ReportPilot interface.

See the coordination dashboard, analysis views, collaborative report workflow and AI-assisted comment drafting shown on the product page.

View ReportPilot